S100/ITB I&O Manual IM101230 RD: JUN 2012 RL: 7A- BA INSTALLATION / OWNER’S MANUAL Improper installation, adjustment, alteration, service or m
10 S100/ITB I&O Manual IM101230 RD: JUN 2012 RL: 7A- BA WARNING Improper installation, adjustment, alteration, service or maintenance can ca
11 S100/ITB I&O Manual IM101230 RD: JUN 2012 RL: 7A- BA 6. MOUNTING CLEARANCES This heater must be mounted with at least the minimum clearances
12 S100/ITB I&O Manual IM101230 RD: JUN 2012 RL: 7A- BA * RECOMMENDED MOUNTING HEIGHTS are typical to provide optimum comfort in general space h
13 S100/ITB I&O Manual IM101230 RD: JUN 2012 RL: 7A- BA FIGURE 3 SYSTEM ELBOW KIT - see page 50 for 180° elbow dimensions 90° elbows (JS-0528-
14 S100/ITB I&O Manual IM101230 RD: JUN 2012 RL: 7A- BA 8. SUSPENDING THE SYSTEM - GENERAL Inadequate or improper suspension of the tube heater
15 S100/ITB I&O Manual IM101230 RD: JUN 2012 RL: 7A- BA 9.1 S100 / ITB STRAIGHT TUBE SYSTEM ~ BURNER AND TUBE INSTALLATION Note: The turbulato
16 S100/ITB I&O Manual IM101230 RD: JUN 2012 RL: 7A- BA FIGURE 9 COUPLER (NOTE: See Section 9.3 for ‘Special Couplers’ at first tube joint: 1
17 S100/ITB I&O Manual IM101230 RD: JUN 2012 RL: 7A- BA 9.2 S100U / ITBU ‘U’-TUBE SYSTEM ~ BURNER AND TUBE INSTALLATION Note: The turbulator
18 S100/ITB I&O Manual IM101230 RD: JUN 2012 RL: 7A- BA FIGURE 11 ‘U’-TUBE TYPICAL HANGER & SUPPORT SPACING 8 - STEEL TUBE(S) 9 - REFLEC
19 S100/ITB I&O Manual IM101230 RD: JUN 2012 RL: 7A- BA SPECIAL COUPLER INSTALLATION 1. Install first tube so that the welded seam along the tu
2 S100/ITB I&O Manual IM101230 RD: JUN 2012 RL: 7A- BA NOTICE: This manual is current for this product. Occasional revision of the product Cert
20 S100/ITB I&O Manual IM101230 RD: JUN 2012 RL: 7A- BA SPECIAL COUPLER INSTALLATION 1. Note the 2 holes opposite each other at the swaged end
21 S100/ITB I&O Manual IM101230 RD: JUN 2012 RL: 7A- BA 9.4 STRAIGHT TUBE SEISMIC RESTRAINT - LATERAL AND LONGITUDINAL In areas prone to earth
22 S100/ITB I&O Manual IM101230 RD: JUN 2012 RL: 7A- BA 9.6 ‘U’ TUBE SEISMIC RESTRAINT In areas prone to earthquake, or as specified on a pro
23 S100/ITB I&O Manual IM101230 RD: JUN 2012 RL: 7A- BA 10. REFLECTOR INSTALLATION S100-U / ITB-U - U’-TUBE: After burner and tubes have been i
24 S100/ITB I&O Manual IM101230 RD: JUN 2012 RL: 7A- BA FIGURE 19 REFLECTOR EXTENSIONS (OPTIONAL - IF REQUIRED ) 1. Reflector extension
25 S100/ITB I&O Manual IM101230 RD: JUN 2012 RL: 7A- BA 12. FLUE VENTING Inadequate venting of a heater may result in asphyxiation, carbon mo
26 S100/ITB I&O Manual IM101230 RD: JUN 2012 RL: 7A- BA HORIZONTAL VENT THROUGH THE SIDEWALL: Any horizontal portion of the flue vent system
27 S100/ITB I&O Manual IM101230 RD: JUN 2012 RL: 7A- BA Use approved 4" (10 cm) (JA-0528-XX) or 6" (15 cm) (JA-0529-XX) horizontal
28 S100/ITB I&O Manual IM101230 RD: JUN 2012 RL: 7A- BA VERTICAL VENT THROUGH THE ROOF: It is the sole responsibility of the installer to adhere
29 S100/ITB I&O Manual IM101230 RD: JUN 2012 RL: 7A- BA 13. COMBUSTION AIR DUCTING Do not install filters on the combustion air intake. Ensure
3 S100/ITB I&O Manual IM101230 RD: JUN 2012 RL: 7A- BA TABLE OF CONTENTS TOPIC ...PAGE INSTAL
30 S100/ITB I&O Manual IM101230 RD: JUN 2012 RL: 7A- BA 13. GAS SUPPLY - HEATER EXPANSION - FLEXIBLE GAS CONNECTION The gas supply must be insta
31 S100/ITB I&O Manual IM101230 RD: JUN 2012 RL: 7A- BA NOTE: Access to the manifold pressure test port is on the top of the valve. A 3/16"
32 S100/ITB I&O Manual IM101230 RD: JUN 2012 RL: 7A- BA The flue vent, and combustion air duct (if installed) must also be configured in such a
33 S100/ITB I&O Manual IM101230 RD: JUN 2012 RL: 7A- BA 14. ELECTRICAL AND THERMOSTAT WIRING (WIRING DIAGRAMS PAGE 35 & 36) The heater
34 S100/ITB I&O Manual IM101230 RD: JUN 2012 RL: 7A- BA 18A. WIRING DIAGRAM: 120 VOLT THERMOSTAT OPERATION (24V Thermostat—next page) Maximum
35 S100/ITB I&O Manual IM101230 RD: JUN 2012 RL: 7A- BA 18B. WIRING DIAGRAM: 24 VOLT THERMOSTAT OPERATION (120V Thermostat - previous page) Ma
36 S100/ITB I&O Manual IM101230 RD: JUN 2012 RL: 7A- BA 19. MULTIPLE TUBE HEATERS per THERMOSTAT Each tube heater requires 120V, 60 HZ electr
37 S100/ITB I&O Manual IM101230 RD: JUN 2012 RL: 7A- BA 20 SEQUENCE OF OPERATION The S87 ignition control module is powered by a 24v transforme
38 S100/ITB I&O Manual IM101230 RD: JUN 2012 RL: 7A- BA CHECK 120V SUPPLY TO RELAY SWITCH IF ELECTRICAL SUPPLY PROBLEM …. MAKE RE-QUIRED R
39 S100/ITB I&O Manual IM101230 RD: JUN 2012 RL: 7A- BA MAIN BURNER LIGHTS SYSTEM RUNS UNTIL CALL FOR HEAT ENDS CALL FOR HEAT ENDS: SYSTEM SHUT
4 S100/ITB I&O Manual IM101230 RD: JUN 2012 RL: 7A- BA APPLICATION A gas-fired radiant tube heater may be installed for heating of commercial /
40 S100/ITB I&O Manual IM101230 RD: JUN 2012 RL: 7A- BA 22. SPARK IGNITION CIRCUIT The step-up transformer in the ignition control provides sp
41 S100/ITB I&O Manual IM101230 RD: JUN 2012 RL: 7A- BA LOW/ UNSTEADY FLAME CURRENT If the current to the S87 flame circuit is less than 1.5 µA
42 S100/ITB I&O Manual IM101230 RD: JUN 2012 RL: 7A- BA 24. START-UP / COMMISSIONING SHEET COMMISSIONING
43 S100/ITB I&O Manual IM101230 RD: JUN 2012 RL: 7A- BA TYPE OF GAS: NG LP DOES BUILDING HAVE A NEGATIVE CONDITION: YES NOIF THIS IS A HIGH
44 S100/ITB I&O Manual IM101230 RD: JUN 2012 RL: 7A- BA Manufactured and shipped in 10 ft lengths. Swaged tube has approximate 4 inch (10
45 S100/ITB I&O Manual IM101230 RD: JUN 2012 RL: 7A- BA Tube Length ‘L’ = center air intake to end 10’ 11’-3 3/4” ; 135 3/4” ; 345 c
46 S100/ITB I&O Manual IM101230 RD: JUN 2012 RL: 7A- BA 26A. BURNER & TUBE KIT ASSEMBLY CHART MODELS S100 / ITB MODELS S100 & ITB are
47 S100/ITB I&O Manual IM101230 RD: JUN 2012 RL: 7A- BA 26B. BURNER & TUBE KIT ASSEMBLY CHART MODELS S100U / ITBU MODELS S100U & ITBU
48 S100/ITB I&O Manual IM101230 RD: JUN 2012 RL: 7A- BA MODEL TURBULATOR LENGTH S100 / ITB 200-70/60/50 10’ (3 m) S100 / ITB 155-50 not requ
49 S100/ITB I&O Manual IM101230 RD: JUN 2012 RL: 7A- BA ORIFICE CHART - ALTITUDE CONVERSION ~ SEE NOTES ON PREVIOUS PAGE ~ 28. HIGH ALTITUDE
5 S100/ITB I&O Manual IM101230 RD: JUN 2012 RL: 7A- BA Heater Expansion It is a normal condition that during heat-up and cool-down a tube heate
50 S100/ITB I&O Manual IM101230 RD: JUN 2012 RL: 7A- BA 29. OPTIONAL ACCESSORIES #2 Lion Chain (115 lb work load) - 200 ft roll ‘S’ Hooks - 1
51 S100/ITB I&O Manual IM101230 RD: JUN 2012 RL: 7A- BA Fresh Air Intake Adapter JS-0532-SE Fresh Air Intake Cap—Wall JS-0532-VC Fresh Air Intak
52 S100/ITB I&O Manual IM101230 RD: JUN 2012 RL: 7A- BA Low Voltage Digital Thermostat (24 Volts - °F or °C selectable) Not for use in corrosiv
53 S100/ITB I&O Manual IM101230 RD: JUN 2012 RL: 7A- BA 90 degree Aluminized Steel Elbow Kit (Kit includes: aluminized steel elbow, coupler, an
54 S100/ITB I&O Manual IM101230 RD: JUN 2012 RL: 7A- BA Optional Items 22 730 REPLACEMENT PARTS S100 / ITB Burner # PART DESCRIPTION PART #
55 S100/ITB I&O Manual IM101230 RD: JUN 2012 RL: 7A- BA # PART DESCRIPTION PART # PART DESCRIPTION PRIMARY SUPPLEMENT 6 BURNER CHAMBER JS-0504-
56 S100/ITB I&O Manual IM101230 RD: JUN 2012 RL: 7A- BA S100 / ITB & S100U / ITBU TUBE SYSTEM PARTS # PART DESCRIPTION PART # PART DESCRI
57 S100/ITB I&O Manual IM101230 RD: JUN 2012 RL: 7A- BA LIMITED WARRANTY CERTIFICATE FOR GAS-FIRED INFRA-RED LOW INTENSITY TUBE HEATERS: S100 /
6 S100/ITB I&O Manual IM101230 RD: JUN 2012 RL: 7A- BA Clearance to combustibles Location of flammable or explosive objects, liquids or vapors
7 S100/ITB I&O Manual IM101230 RD: JUN 2012 RL: 7A- BA TABLE 1 MINIMUM CLEARANCES TO COMBUSTIBLES* FIGURE 1 MINIMUM CLEARANCES TO COMBUSTIBLES
8 S100/ITB I&O Manual IM101230 RD: JUN 2012 RL: 7A- BA VENT END CLEARANCE: Clearances from the vent pipe are determined by local or national ins
9 S100/ITB I&O Manual IM101230 RD: JUN 2012 RL: 7A- BA 2. INSTALLATION IN COMMERCIAL AIRCRAFT HANGARS Low intensity radiant tube heaters are su
Komentáře k této Příručce